45580 Terminal Drive, Dulles, Loudoun County, Virginia 20164
Completed November 2000 54,400 square feet

Advantages of CyberFortress I
Innovative Engineering & Pre-Installed Infrastructure
Complete Design and Technical Specifications
Architectural Drawings

Advantages of CyberFortress™ I

CyberFortress™
Enhancements Include:

Value & Time Benefits:

  • Fortified 7.25" concrete (4000 PSI) tilt-up capable of withstanding 150 mph winds
  • Structure is free of window penetrations
  • Spandrel glass on top of concrete panel at building entry for aesthetic appea
  • Saves up to $560,000 in installation of Kevlar bulletproofing of existing windows in comparably sized building with typical window line (3,728 sq ft of glass @ $150/sf)
  • Fortress construction enhances continuity of site and provides advantage for attracting security and continuity-minded customers
  • Six-inch industrial strength slab capable of 350 lbs/sf live load
  • CyberFortress™ slab exceeds typical slab thickness by 2 inches
  • Prevents having to reinforce or re-install slab found in typical commercial building
  • Concrete roof deck free of internal roof drains
  • Saves upwards of $625,000.00 in installation of concrete roof deck in an comparably sized existing building with a typical EPDM single-ply roof
  • Lack of internal roof drains ensures site will remain free of roof water leakage
  • Fortress construction enhances continuity of site and provides advantage for attracting security and continuity-minded customers
  • GAF roof system (150 mph wind resistant) w/ 20-year warranty
  • Installation of GAF Roof system cost $330,000.00–$125,000 more than a lesser quality EPDM roofing system
  • 150 mph wind resistant roof ensures continuity of site during the worst of natural catastrophes
  • Fortress construction enhances continuity of site and provides advantage for attracting security and continuity-minded customers
  • Pre-installation of Steel Reinforcements:
         Includes structural enhancements to roof/overhead rack support/ pre-engineered generator platform/cooling system dunnage/satellite platform
  • Pre-installed steel fortification of site totals $185,000 and includes pre-installed roof dunnage
  • Saves upwards of $250,000-$400,000 in re-engineering and steel fortification of an existing building structure
  • Fortress construction enhances continuity of site and provides advantage for attracting security and continuity-minded customers
  • Pre-installed Caterpillar 2,000 kW generator with enclosure
  • Caterpillar Generator with enclosure cost $330,000
  • Pre-installation saves 14-20 weeks of lead-time in addition to installation time
  • Pre-installed Gen-set accoutrements on parallel bus system with modular expandability to four 2000 kW generators
  • Pre-installed Gen-Set accoutrements cost $1,100,000 and includes 480v paralleling switchgear, wiring and distribution boards
  • Pre-installation saves 14-20 weeks of construction lead time
  • Pre-installed Generator Platform capable of four 2,000 kW generators
  • Enables modular expandability without interruption to operations
  • Prevents post construction installation

Why Waste Time & Money Fortifying an Existing Building?
Save Time and Money by Leasing CyberFortress™ I

CyberFortress™
Enhancements Include:

Value & Time Benefits:

  • Pre-installed 20,000 gallon Underground Fuel Tank
  • Pre-installed at a cost of $145,000
  • Ensures integrity of fuel source
  • Saves 10-12 weeks in permit time alone
  • Prevents post construction installation and associated re-construction of parking areas
  • Four pre-installed 3,000-amp parallel switchgear w/ "rack in" breakers and Equi potential ground grid
  • Pre-installed at an expense of $475,000
  • Saves 18-20 weeks of construction lead time
  • Electrical density of 100 watts per foot (6,500 amps/480v/3 Phase)
  • More than five times the electrical power capacity of a typical building
  • Saves 16-26 weeks in engineering and electric utility construction lead time
  • Prevents costs associated with trenching, installation of new conduits and transformers
  • Pre-installed redundant Lightning Protection Systems (Active & Passive)
  • Redundancy of systems ensures continuity of site during the worst of lightning catastrophes
  • Fortress construction enhances continuity of site and provides advantage for attracting security and continuity-minded customers
  • Pre-Installed "room ready" Demarcation Area for telecommunications installation with two diverse pre-installed telecommunications points of entry with 12 empty 4-inch conduits at each
  • Pre-built and cooled Demarcation Area allows for telecommunications "plug and play" installation
  • Pre-installation of dual points of entry and empty conduits eases telecommunications installation and avoids post construction installation
  • Design provisions for triple overhead racks
    (Hanging weight capacity up to 100 lbs/LF)
  • Pre-installed steel reinforcements ensures overhead rack support…a unique pre-installed engineering enhancement that would be costly to replicate in a typical existing commercial building
  • Pre-installed four zone pre-action sprinkler system (FM 200 compatible)
  • Pre-installation prevents reconstruction of sprinkler system
  • Eases installation of smoke detection and FM200 systems
  • Pre-installed perimeter security fencing, controlled access gates and concrete ballards at building entry
  • Pre-installed at an expense of $200,000
  • Fortress construction enhances continuity of site and provides advantage for continuity and security-minded customers
  • Pre-installed ballistic glass entry door
  • Pre-installed an expense of $30,000
  • Fortress construction enhances continuity of site and provides advantage for attracting security and continuity-minded customers
  • Pre-installation of roof-top satellite platform\
  • "Plug and play" convenience
  • Pre-installation of rough-in for two ADA compliant restrooms
  • Avoids trenching and costs associated with post building construction of restroom facilities


Raise Your Expectations! Now, You Have An Option That Removes
the Need to Waste Time and Money Fortifying an Existing
Commercial Building!