|

|

45580 Terminal Drive, Dulles, Loudoun County, Virginia 20164
Completed November 2000 54,400 square feet
Advantages
of CyberFortress I
Innovative
Engineering & Pre-Installed Infrastructure
Complete
Design and Technical Specifications
Architectural
Drawings
Advantages
of CyberFortress I
|
CyberFortress
Enhancements Include:
|
Value
& Time Benefits:
|
- Fortified
7.25" concrete (4000 PSI) tilt-up capable of withstanding
150 mph winds
- Structure
is free of window penetrations
- Spandrel
glass on top of concrete panel at building entry for aesthetic
appea
|
- Saves
up to $560,000 in installation of Kevlar bulletproofing
of existing windows in comparably sized building with
typical window line (3,728 sq ft of glass @ $150/sf)
- Fortress
construction enhances continuity of site and provides
advantage for attracting security and continuity-minded
customers
|
- Six-inch
industrial strength slab capable of 350 lbs/sf live load
|
- CyberFortress
slab exceeds typical slab thickness by 2 inches
- Prevents
having to reinforce or re-install slab found in typical
commercial building
|
- Concrete
roof deck free of internal roof drains
|
- Saves
upwards of $625,000.00 in installation of concrete roof
deck in an comparably sized existing building with a typical
EPDM single-ply roof
- Lack
of internal roof drains ensures site will remain free
of roof water leakage
- Fortress
construction enhances continuity of site and provides
advantage for attracting security and continuity-minded
customers
|
- GAF
roof system (150 mph wind resistant) w/ 20-year warranty
|
- Installation
of GAF Roof system cost $330,000.00$125,000 more
than a lesser quality EPDM roofing system
- 150
mph wind resistant roof ensures continuity of site during
the worst of natural catastrophes
- Fortress
construction enhances continuity of site and provides
advantage for attracting security and continuity-minded
customers
|
- Pre-installation
of Steel Reinforcements:
Includes structural enhancements
to roof/overhead rack support/ pre-engineered generator
platform/cooling system dunnage/satellite platform
|
- Pre-installed
steel fortification of site totals $185,000 and includes
pre-installed roof dunnage
- Saves
upwards of $250,000-$400,000 in re-engineering and steel
fortification of an existing building structure
- Fortress
construction enhances continuity of site and provides
advantage for attracting security and continuity-minded
customers
|
- Pre-installed
Caterpillar 2,000 kW generator with enclosure
|
- Caterpillar
Generator with enclosure cost $330,000
- Pre-installation
saves 14-20 weeks of lead-time in addition to installation
time
|
- Pre-installed
Gen-set accoutrements on parallel bus system with modular
expandability to four 2000 kW generators
|
- Pre-installed
Gen-Set accoutrements cost $1,100,000 and includes 480v
paralleling switchgear, wiring and distribution boards
- Pre-installation
saves 14-20 weeks of construction lead time
|
- Pre-installed
Generator Platform capable of four 2,000 kW generators
|
- Enables
modular expandability without interruption to operations
- Prevents
post construction installation
|
Why
Waste Time & Money Fortifying an Existing Building?
Save Time and Money by Leasing CyberFortress I
|
CyberFortress
Enhancements Include:
|
Value
& Time Benefits:
|
- Pre-installed
20,000 gallon Underground Fuel Tank
|
- Pre-installed
at a cost of $145,000
- Ensures
integrity of fuel source
- Saves
10-12 weeks in permit time alone
- Prevents
post construction installation and associated re-construction
of parking areas
|
- Four
pre-installed 3,000-amp parallel switchgear w/ "rack
in" breakers and Equi potential ground grid
|
- Pre-installed
at an expense of $475,000
- Saves
18-20 weeks of construction lead time
|
- Electrical
density of 100 watts per foot (6,500 amps/480v/3 Phase)
|
- More
than five times the electrical power capacity of a typical
building
- Saves
16-26 weeks in engineering and electric utility construction
lead time
- Prevents
costs associated with trenching, installation of new conduits
and transformers
|
- Pre-installed
redundant Lightning Protection Systems (Active & Passive)
|
- Redundancy
of systems ensures continuity of site during the worst
of lightning catastrophes
- Fortress
construction enhances continuity of site and provides
advantage for attracting security and continuity-minded
customers
|
- Pre-Installed
"room ready" Demarcation Area for telecommunications
installation with two diverse pre-installed telecommunications
points of entry with 12 empty 4-inch conduits at each
|
- Pre-built
and cooled Demarcation Area allows for telecommunications
"plug and play" installation
- Pre-installation
of dual points of entry and empty conduits eases telecommunications
installation and avoids post construction installation
|
- Design
provisions for triple overhead racks
(Hanging weight capacity up to 100 lbs/LF)
|
- Pre-installed
steel reinforcements ensures overhead rack support
a
unique pre-installed engineering enhancement that would
be costly to replicate in a typical existing commercial
building
|
- Pre-installed
four zone pre-action sprinkler system (FM 200 compatible)
|
- Pre-installation
prevents reconstruction of sprinkler system
- Eases
installation of smoke detection and FM200 systems
|
- Pre-installed
perimeter security fencing, controlled access gates and
concrete ballards at building entry
|
- Pre-installed
at an expense of $200,000
- Fortress
construction enhances continuity of site and provides
advantage for continuity and security-minded customers
|
- Pre-installed
ballistic glass entry door
|
- Pre-installed
an expense of $30,000
- Fortress
construction enhances continuity of site and provides
advantage for attracting security and continuity-minded
customers
|
- Pre-installation
of roof-top satellite platform\
|
- "Plug
and play" convenience
|
- Pre-installation
of rough-in for two ADA compliant restrooms
|
- Avoids
trenching and costs associated with post building construction
of restroom facilities
|
Raise Your
Expectations! Now, You Have An Option That Removes
the Need to Waste Time and Money Fortifying an Existing
Commercial Building!
|