45580 Terminal Drive, Dulles, Loudoun County, Virginia 20164
Completed November 2000 54,400 square feet

Advantages of CyberFortress I
Innovative Engineering & Pre-Installed Infrastructure
Complete Design and Technical Specifications
Architectural Drawings

Innovative Engineering & Pre-Installed Infrastructure

  • Newly constructed, fortified concrete and steel construction engineered to 150 mph wind resistance
  • Spandrel glass over concrete panel offers aesthetic appeal without compromising security-there are no external window penetrations in the structure
  • Pre-Installation of one 2,000 kW Caterpillar Generator with enclosure; 20,000 gallon underground Diesel fuel tank and pre-engineered Generator Platform capable of four 2,000 kW generators
  • Pre-Installation of roof-top Satellite Platform
  • 18' clear ceiling heights throughout with 30'x40' column spacing
  • Structural support capable of triple overhead racks (100lbs/LF)
  • Industrial strength slab at grade (350 lbs live load/SF)
  • Concrete roof deck free of internal roof drains
  • Fully adhered GAF roof system (twenty year warranty) rated to withstand 150 mph wind
  • 100 watts/SF electrical density (6,500amps/480v/3 phase)
  • Pre-installation of four 3,000 amp switch gear complete with "rack in" breakers
  • Dual Points of Entry with pre-installation of twelve 4-inch conduits at each
  • Pre-installation of cooled "Room Ready" Telecommunications Demarcation Area
  • Pre-installation of Cooling Dunnage and design provisions for independent Direct Expansion and CRAC units
  • Pre-installation of Equi potential ground grid
  • Pre-installation of four zone pre-action sprinkler system with design provisions for high sensitivity smoke detection
  • Perimeter security fencing (concrete ballards at building entry) with controlled access to parking and loading areas
  • Design provisions for CCTV monitoring
  • Pre-installation of active and passive lightning protection systems
  • Pre-installation of ballistic-rated (Level 3) glass entry door
  • Pre-installation of rough-in for ADA compliant restrooms