45580 Terminal Drive, Dulles, Loudoun County, Virginia 20164
Completed November 2000 54,400 square feet

Advantages of CyberFortress I
Innovative Engineering & Pre-Installed Infrastructure
Complete Design and Technical Specifications
Architectural Drawings

Complete Design and Technical Specifications

ARCHITECTURAL & STRUCTURAL
Fortress Construction: Single-story, reinforced concrete building containing 54,400 usable square feet of space designed, engineered and built specifically for mission-critical compatible purposes

Exterior walls

7.25" thick, reinforced 4000psi concrete tilt-up panels

Structural Wind Load

Environmentally hardened to 150mph wind resistance

Exterior Glass

Building faÁade has no window penetrations. Exterior spandrel glass to be placed over concrete panels for aesthetic appeal

Ceiling Height

18' Clear throughout (slab to bottom of joist)

Column Spacing

30'x 40'

Floor Load

350lbs psf live load

Roof Design

Deck:
Lightweight reinforced concrete

Roof System:
Fully adhered GAF roof system (with twenty year warranty) rated to withstand 150mph wind.

Drainage:
Structure is free of internal roof drains - roof water is conveyed via external scuppers and downspouts

Flood Zone

Outside of 100 yr. Flood Plain

Geo-technical

Stable ground largely underlain with bedrock and shale

ELECTRICAL  
Primary & Alternative Electrical Services/ Density

Electrical service delivered via Virginia Power, Circuit 705, Sterling Park substation, Sterling, Virginia

Pre-installation of 6500 amps/480v/3 Phase enabling electrical density of up to 100 watts/SF

Design provisions in place for installation of redundant alternate power feed sourced from Virginia Power's Circuit 709

Switchgear

Initial installation of four (4) 3000 amp switch gear complete with "rack in" breakers - enabling electrical service expandability without interruption to operations

N+1 Provisions

Pre-engineeed Generator Platform capable of four (4) 2,000 kW generators

Pre-installation of one (1) 2,000 kW Caterpillar Generator on parallel bus system to provide modular expandability to four (4) 2000 kW generators

Pre-installation of (1) 20,000 gallon underground fuel storage tank - enabling 48 hour run time for initial generator without refueling

Site can accommodate up to three (3) additional 20,000 gallon fuel vaults for a total of 80,000 gallons

Lightning Protection

Active and Passive lightning protection systems Grounding System

Equi potential signal ground grid

COMMUNICATIONS  
Fiber Optics

Eight (8) diverse fiber providers within close proximity of site

Two (2) diverse Points of Entry with initial installation of twelve (12) 4" conduits at each POE

"Room Ready" Demarcation Area for telecommunications pre-installation

Structural provisions for triple overhead racks (Hanging weight up to 100lbs/LF) Satellites

Designated roof-top satellite platform (National and International site lines)

MECHANICAL  

Air Conditioning
Design provisions for independent Direct Expansion Cooling Units and CRAC units offering modular expandability
FIRE PROTECTION  
Fire Detection

Design provisions for high sensitivity smoke detection Fire Suppression

Initial installation of four zone pre-action sprinkler system

SECURITY

Building exterior is entirely free of window penetrations - spandrel glass over concrete panel only

Pre-installation of perimeter fencing, controlled access to parking and loading areas, and concrete ballards and building entrance

Design provisions for CCTV surveillance

Pre-installed ballistic glass (level 3 entry door)