| Ceiling
Height |
18'
clear per floor |
| Exterior
Glass |
Mission
critical areas of structure are entirely free of window penetrations
|
| Column
Spacing |
30'
x 30' |
| Exterior
walls |
8.5"
thick, reinforced 4000psi concrete tilt-up with textured acrylic
coating |
| Floor
Load/Overhead Racks and Continuity Seals |
350lbs/SF
live load per floor. Structural provisions for triple mounted
hanging trays (Hanging weight up to 100lbs/LF)
Second
floor slab is sealed to the exterior walls; any second floor
water discharge would be relieved to the exterior of the
building through the perimeter walls
|
| Elevators
|
Pre-installation
of Passenger (2,500 lbs.) and Freight (4,500 lbs) elevators
with roof stop |
| Roof
Design |
Deck:
Lightweight
reinforced concrete
Membrane:
Fully
adhered roof system rated to withstand 150mph wind
Drainage:
Structure
is free of internal roof drains-roof water is conveyed via
external scuppers and downspouts
|
| Structural
Wind Load |
Environmentally
hardened to 150-mph wind resistance |
| Flood
Zone |
Outside
100 year Flood Plain |
| Geo-Technical
|
Stable
ground underlain with bedrock |
| ELECTRICAL |
|
| Primary
and Alternative Electrical Services/Density |
Primary
electrical service delivered via Northern Virginia Electric
Cooperative (NOVEC). Feeder #1 from the Battlefield Substation,
Manassas, Prince William County, Virginia (adjacent to the
CyberFortressô II property line)
Feeder
#1 provides pre-installation of up to 22 MVA/12.47 kV/3
phase to the Phase I building-enabling up to 250 watts/sf
Provisions
in place for installation by Tenant of redundant alternate
power feed to be sourced from planned substation across
from the Battlefield Business Park on the south side of
Interstate 66.
|
| N+1
Generator Provisions and Paralleling Switchgear |
Initial
installation of two (2) 2,000 kW Caterpillar Generators
on paralleling switchgear with modular expandability to
twelve (12) 2,000 kW generators
Initial
installation of one (1) 12,000 gallon fuel storage vault
The
Phase I building can accommodate up to four (4) 12,000 gallon
fuel storage vaults
|
| Lightning
Protection |
Initial
installation of active and passive lightning protection systems
|
| Grounding
System |
Initial
installation of Equi potential signal ground grid |
| COMMUNICATIONS |
|
| Fiber
Optics |
Diversity
of fiber providers at or adjacent to site-Verizon, MCI,
MFN and Qwest.
Initial
installation of two (2) diverse points of bandwidth entry
with initial installation of twenty-four (24) empty 4" conduits
at each point of entry
|
| Satellites
|
Designated
roof-mounted satellite platform with eight (8) pre-installed
roof penetrations for satellite and antennae placement |
| MECHANICAL |
|
| Air
Conditioning |
Provisions
for Direct Expansion Cooling Units and CRAC units (installation
by Tenant)
Alternative
structural provisions in place for central plant-chillers
and cooling towers (installation by Tenant)
|
| FIRE
PROTECTION |
|
| Fire
Detection |
Design
provisions for high sensitivity smoke detection Fire Suppression
Initial
installation of pre-action sprinkler valves
|
| SECURITY |
Design
provisions for CCTV
Structure
is entirely free of window penetrations
Secured
site with controlled access at entrance(s), mechanical yard
and loading areas
|